Pilot Watch Shop|Breitling Watch|Gucci Watches|Used Airplanes|Airplane Pictures
Click to return to the AeroSpaceNews.com home page. Airline News - Pilot Watch - Aerospace News
Welcome, Guest. Please login or register.
January 08, 2009, 11:15:24 AM

Login with username, password and session length
Search:     Advanced search
To keep track of our most recent forum postings in your news reader, please add this link: Airline News Feeds
172 Posts in 124 Topics by 109 Members
Latest Member: aaaWaydayPiz215
* Home Help Search Login Register


Airline News Bookmark this page or send it to a friend!
+  Airline News - Pilot Watch - Aerospace News
|-+  Space Forums
| |-+  Manned Programs
| | |-+  Orion
| | | |-+  Ares I Mobile Launcher - Constellation Program Contract Awarded By NASA
« previous next »
Pages: [1] Print
Author Topic: Ares I Mobile Launcher - Constellation Program Contract Awarded By NASA  (Read 239 times)
Airline News
Administrator
Full Member
*****
Posts: 160


View Profile WWW
Ares I Mobile Launcher - Constellation Program Contract Awarded By NASA
« on: May 08, 2008, 02:12:18 PM »

Source: NASA

CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center has awarded a contract to Hensel Phelps of Orlando, Fla., for the construction of the Ares I mobile launcher for the Constellation Program. Ares I is the rocket that will transport the Orion crew exploration vehicle, its crew and cargo to low Earth orbit. The contract includes an option for an additional Ares I mobile launcher. It is a firm fixed-price contract with a value of $263,735,000, if all options are exercised.

The mobile launcher will support the Ares I and the vehicle's associated ground support equipment. It will be used in the assembly, testing and servicing of the Ares I at existing Kennedy facilities. The mobile launcher will transport the Ares I rocket to the launch pad and provide ground support for launches. The mobile launcher consists of the main support structure that comprises the base, tower and facility ground support systems, which include power, communications, conditioned air, water for cooling, wash-down, and ignition over-pressure protection.

The contractor will supply all labor, materials and equipment necessary for construction of the Ares I mobile launcher. Ground support equipment, such as umbilicals, propellant and gases, instrumentation, controls and communications, necessary to support the Ares I rocket will be provided and installed under a separate contract or contracts.

The tower of the mobile launcher will have multiple platforms for personnel access and will be approximately 390 feet tall.
Construction will take place at the mobile launcher park site area located north of Kennedy's Vehicle Assembly Building at the space center in Florida.

Looks like progress on return to the moon - finally!
Logged

Never been here before? Be sure to see our home page --> Airline News <-- AeroSpaceNews.com is a pretty cool site!

Please support our Aerospace News with a paid subscription. Thank you.

Be sure to check out our cool Pilot Watches, Breitling Watches, Hot Pic section, and our Aviation Jobs listings.

Volkswagen Diesel | V-22 Osprey Video | Fishing Boat | Aircraft For Sale | Electric Guitar
Pages: [1] Print 
« previous next »
Jump to:  

Powered by MySQL Powered by PHP Airline News - Pilot Watch - Aerospace News | Powered by SMF 1.0.5.
© 2001-2005, Lewis Media. All Rights Reserved.
Valid XHTML 1.0! Valid CSS!