Airline News - Pilot Watch - Aerospace News aviation forum aerospace news
May 22, 2012, 04:09:39 AM *
Welcome, Guest. Please login or register.
Did you miss your activation email?

Login with username, password and session length
News: To keep track of our most recent forum postings in your news reader, please add this link: Airline News Feeds
 
   Home   Help Search Login Register  


Airline News Bookmark this page or send it to a friend!
Pages: [1]
  Print  
Author Topic: Boeing Changes 787 Power Panel After In Flight Electrical Fire  (Read 557 times)
AeroSpace News
Administrator
Sr. Member
*****
Posts: 279


View Profile WWW
« on: November 24, 2010, 03:06:07 PM »

Boeing is developing minor design changes to power distribution panels on the 787 and updates to the systems software that manages and protects power distribution on the airplane. These changes come as the result of what has been learned from the investigation of an onboard electrical fire on a test airplane, ZA002, earlier this month in Laredo, Texas.

"We have successfully simulated key aspects of the onboard event in our laboratory and are moving forward with developing design fixes," said Scott Fancher, vice president and general manager of the 787 program. "Boeing is developing a plan to enable a return to 787 flight test activities and will present it to the U.S. Federal Aviation Administration (FAA) as soon as it is complete."



Engineers have determined that the fault began as either a short circuit or an electrical arc in the P100 power distribution panel, most likely caused by the presence of foreign debris. The design changes will improve the protection within the panel.  Software changes also will be implemented to further improve fault protection.

The P100 panel is one of five major power distribution panels on the 787. It receives power from the left engine and distributes it to an array of systems.

The 787 team is now assessing the time required to complete the design changes and software updates that are being developed. A revised 787 program schedule is expected to be finalized in the next few weeks.

"Our team is focused on developing these changes and moving forward with the flight test program," said Fancher. "The team in Laredo is also well along in preparing to return ZA002 to Seattle."

Source: Boeing
Logged

Follow AeroSpaceNews on Twitter!



Like AeroSpaceNews.com on Facebook!



Never been here before? Be sure to see our home page --> Airline News <-- AeroSpaceNews.com is a pretty cool site!

Please support our Aerospace News with a paid subscription. Thank you.

Be sure to check out our cool Pilot Watches, Breitling Watches, Hot Pic section, and our Aviation Jobs listings.

Los Angeles Aerial Photography | Volkswagen Diesel | V-22 Osprey Video | Fishing Boat | Aircraft For Sale | Electric Guitar
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.12 | SMF © 2006-2009, Simple Machines LLC Valid XHTML 1.0! Valid CSS!